Media

Projects

Luxora Bac Giang Apartment

Luxora Bac Giang Apartment

  • Construction company: Hoa Binh Construction (HBC)
  • Number of floors: 28 above-ground floors + 1 basement level
  • Total floor area: 122.128m²
Quantity:

All water supply and drainage pump systems

Gia Binh International Airport

Gia Binh International Airport

  • Construction company: Coteccons
  • Total floor area: 1.960 ha
Quantity:

All pumps of FF system, HVAC system, water supply and drainage system

Taihan Cable Factory Dong Nai

Taihan Cable Factory Dong Nai

  • Construction company: Hyosung E&C (Main constractor)/Mega D&C (Technology Constractor)/G-Tech (Civil Constractor)
  • Total floor area: ~56.200 m²
Quantity:

All pumps of FF system, water supply and drainage system

Social Housing – Dinh Hoa Area 5 – BECAMEX Group

Social Housing – Dinh Hoa Area 5 – BECAMEX Group

  • Construction company: BINH DUONG CONSTRUCTION AND TRANSPORTATION JOINT STOCK COMPANY
  • Number of floors: 20 floors (6 towers)
  • Total floor area: 23.238 m²
Quantity:

All water supply supply and drainage pump system, include completed individual VFD booster pump system.

Fursys Dong Nai Factory Expantion Project

Fursys Dong Nai Factory Expantion Project

  • Construction company: Mega D&C
  • Total floor area: ~80.000m²
Quantity:

All FF pumps and Water supply and drainage system

Yakult Factory Binh Duong

Yakult Factory Binh Duong

Quantity:

All of HVAC pump system.

BMW – MINI Retail.Next Showroom Complex (Bien Hoa)

BMW – MINI Retail.Next Showroom Complex (Bien Hoa)

  • Number of floors: 01 basement level and 02 above-ground floors
  • Total floor area: over 4000m2
Quantity:

Booster system and submersible pump system.

S.I.S Stroke Treatment Specialized Research and Training Center

S.I.S Stroke Treatment Specialized Research and Training Center

  • Number of floors: 01 Basement + 11 floors
  • Total floor area: >48.000m2
Quantity:

FF pump system 110kW, Water supply system, Water drainage system

REPLACING FIRE FIGHTING PUMP SYSTEM FOR SAIGON REVERSIDE OFFICE CENTER

REPLACING FIRE FIGHTING PUMP SYSTEM FOR SAIGON REVERSIDE OFFICE CENTER

Quantity:

Fire fighting system: 02 55kW Fire fighting pumps and 01 jockey pump.

Project: Establishing the UHS Teaching Hospital, Cambodia

Project: Establishing the UHS Teaching Hospital, Cambodia

  • Construction company: China Construction Fourth Engineering Division Corp. Ltd.
123